Project russia 5.5 all connectors + fix Asia
The output of the Russia 5.5 card for ETS-2 is 1.47.
The development of the R-21 highway continued -the section of the R-21 highway from Lodeynoye Pole to Kem was demolished and rebuilt.
Demolished Petrozavodsk, Medvezhegorsk,By whom and built anew.
There is loading and unloading at the gas station in transit us. points-Inema, Yarn, Sopoha
Credits:
Palych